News & Event

Home / News
NEWS LIST

fiber blowing system

If you want to know more about the fiber blowing system, the following articles will give you some help. These news is the latest market situation, trend in development, or related tips of the fiber blowing system industry. More news about fiber blowing system, are being released. Follow us / contact us for more fiber blowing system information!
2025
DATE
06 - 19
[Underground Cable Installation Solution] Microduct Installation-A Method To Reduce Curve Deviation In Horizontal Directional Drilling(HDD).
Horizontal directional drilling (HDD) is a construction machine used to lay various underground public facilities without excavating the ground, such as microducts and cables. Based on the problems encountered during underground crossing construction with HDD, this paper analyzes the causes of devia
Read More
2025
DATE
05 - 19
[Underground Cable Installation Solution] What Kind of Problems Will A Low-quality Microduct Connector Bring To The Fiber Blowing Construction?
Microduct connectors(also called microduct coupler) are designed to provide a secure and stable connection between two segments of Microducts and main conduit. Straight and Transition couplers are available. Multiple sizes available starting from 5 mm to 27mm.
Read More

Contact Us

 Tel: +86 21 3872 6791    +86 21 3872 6792
  M: +86 187 2062 4696
  Rm402 block A Watts gallop tower No.2816 YiXian Rd, BaoShan District, Shanghai 200441.

Our Products

Solution

Quick Links

©2003-2026 Fiber Cable Solution Technology Co.,Ltd. All Rights Reserved.