Home / Products / Underground Cable Installation / Telecom Manhole Chamber / SMC Material Composite Access Chambers Superior to Cement Manhole

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

SMC Material Composite Access Chambers Superior to Cement Manhole

  • Telecom chamber is easy installation.
  • Telecom handhole has height adjustable.
  • Strong bearing capacity for access chamber installation.
  • Electrical manhole with strong corrosion resistance.
Availability:
Quantity:
  • FCST-TH-SMC01

  • FCST


Application Of SMC Telecommuncation Manhole In ODN

ODN architecture (Optical Distribution Network), optical distribution network is an FTTH optical cable network based on PON equipment. Its role is to provide an optical transmission channel between the OLT and the ONU.

Product Size

FCST-TH-SMC通用图片 (1)


Enclosure Model

Enclosure Size

Manhole Cover

Size

Maximum Error

Manhole Cover Load Grade


L

I

W

w

H

h

C

D

E

A

B



FCST-TH-SMC01

540

660

400

520

583

682

387.5

71.5

Φ45

600

460

±3

B125(12.5T)

applies to sidewalk, bicyclelane,small car parks and

underground parking.

Product Advantages

lStrong bearing capacity

The manufacturing materials mainly use high-strength and high-modulus thermosetting SMC composite materials. The axial load can reach 100KN, and the lateral load can reach 40KN.

lStrong corrosion resistance

SMC has good chemical corrosion resistance (acid,alkali, salt, organic solvent, etc.), long-term use in the underground environment will not cause changes in the internal structure and performance of the material.

lGood wave permeability

SMC material has strong electromagnetic wave penetration, which is conducive to the signal transmission of various equipment and can receive large Part of the satellite signal, high reliability.

lGood resistance to high and low temperature

The chamber box heat distortion temperature is extremely high, and it can maintain good performance at low temperature. The product can be used for a long time in the range of -40~100℃.

lEasy installation

The installation process is simple, the zero-based construction staff can start the installation after briefly reading the manual. Product installation is not affected by any climate and environment, construction at any time.

lConvenient transportation and cost reduction

The enclosure has a simple structure and is assembled from scattered parts. which is suitable for long-distance transportation and reduces costs.

lLong service life

SMC composite material has excellent comprehensive properties such as high and low temperature resistance,chemical corrosion resistance, providing basic guarantee for buried service life of more than 30 years.

lLow life cycle cost

During the life of the access chamber installation, the inside of the enclosure is cleaned, the maintenance is small, and the cost is low.

         lHeight adjustable

The manhole chamber has an adjustment function. The adjusting baffle and the adjusting accessories bolt work together to adjust the height of the manhole cover according to the actual construction site ground conditions, the maximum adjustment height of the manhole cover is 50mm.

SGO_M86U_D5GH_4IRY7


Product Structure

8QAQ42ODV`25NJCI52


Product Specifications

All products comply with EN124:1994 standards.

Chemical Resistance Performance

Chemicals

Concentrated Sulfuric Acid

Sodium Hydroxide

Sodium Chloride

Test Conditions

Soaked in the specified solution for 48h

Test results

No obvious corrosion on the surface, qualityloss <1%

Mechanical Performance

Items

Standard No.

Requirements

Test Results

Tensile Strength

GB/T1447-2005

100MPa

105MPa

Tensile Modulus

GB/T1447-2005

10GPa

11.8GPa

Bending Strength

GB/T1449-2005

200MPa

213MPa

Flexural Modulus

GB/T1449-2005

10GPa

11.3GPa

Impact Toughness

GB/T1451-2005

80KJ/

90.8KJ/

Barr's Hardness

GB/T3854-2005

50

56

Chamber Load

 Chamber Type

FCST-TH-SMC01

FCST-TH-SMC02

FCST-TH-SMC03

Axial Test Load

100KN

100KN

100KN

Lateral Test Load

40KN

40KN

40KN

Thermal Performance

 Items

Standard No.

Test Results

Heat Distortion Temperature

GB/T1634.2-2004

> 200

Bending Strength

GB/T9979- 2005(-40°C)

265MPa

Flexural modulus

GB/T9979- 2005(-40°C)

1.43x10^(4)MPa

Bending strength retention rate

GB/T9979- 2005(-40°C)

124%

Flexural modulus retention rate

GB/T9979- 2005(-40°C)

11.16%

Linear expansion coefficient

B/T2572-205(26~100)

1.66x10^(-5)

Product Detail

IF%I9KH3RT)SIWQ)ZHJ

V9HJLKM1V3KYPEWHGDN

J`LPYF5HR48BL`HJ4P2O

3OJ5HQ9UF3SZSB)VYZWP9

Comprehensive Performance Comparison

AXK3HXG0HDPUY6H32

Comparison Category

Items

Manual Stacking Manhole

SMC Telecommuncation Manhole

Comparative Analysis

Engineering Performance Comparison

Craftsmanship

Hand-made on site, uncontrollable quality

Macromolecule resin is used as raw material, factory prefabricated production, one-time injection molding, stable and controllable quality.

The production process of SMC Manhole is more advanced, and the quality is more stable and reliable.

Construction Conditions

Artificial brickwork, affected by climate and environment

Construction period (as rain, high temperature, severe cold)

Not affected by any climate or environment

SMC Manhole can be constructed all day

Material Performance

Not resistant to acid and alkali corrosion

Resistant to acid and alkali corrosion

SMC material has better resistance to acid, alkali and salt.

Connection Method

Rigid connection, easy to fall off and leak.

Flexible connection, uniform settlement with the pipeline.

The SMC Manhole connection method is more conducive to keeping the well room clean and not easy to leak.

Maintain

Irregular maintenance and frequent blockage.

Simple maintenance

The SMC Manhole is easy to maintain, no need to clean up brittle stones, bricks, debris, etc.

Service Life

Average service life 5-10 years

Not easy to collapse, construction is safe, and the service life is at least 30 years

The life of SMC material itself is ≥30 years

Economic Performance Comparison (take 10 wells as an example)

Number of construction workers

20

2

SMC Manhole saves labor

Days spent

2 days

half of the day

SMC Manhole saves time

Comprehensive cost

High

Low

The construction period of the SMC Manhole is short, which saves a lot of labor

Prospect

resource utilization

Consuming resources, water resources, and fertile land polluting the environment

Environmental protection and energy saving, land saving, water saving, material saving, recyclable

SMC Manhole energy saving and environmental protection

development trend

Destroy the environment, waste resources, exit the market

The state focuses on promoting new energy-saving and environmentally-friendly building materials

SMC Manhole conforms to the country's sustainable development

Overview

The construction of SMC buried manual wells is flexible and efficient, with simple construction technology, environmental protection and energy saving, low cost and long service life.

Packing And Transportation

Packing description

Due to the structural characteristics of the product, the factory packaging can be selected according to the actual needs of customers,transportation distances, and transportation routes.

Disassembly and transportation

The structure of the telecom chamber is simple and easy to disassemble, and all the components can be split into discrete parts, which are stacked and bundled flat. It occupies small space, low transportation cost, ,disassembly and bundling are more conducive to product stability, it is convenient to transport and goods damage is small.

6FNA`)GRF2LYJ2281Y3L

Product Application

B9(GLR4YZ5SJ(`1Y_M

Configuration Selection

)Q6JDBOCK0LKJL47L2057

E36TQCRAI3JTJDJ`(Y9

通用图片-1

合作商


alt underground fiber vault product series

Previous: 
Next: 
Contact us

Product Category

Contact Us

Tel: +86 21 3872 6791

Fax: +86 21 3872 6792
Mobile: +86 187 2062 4696

Email:sales@fcst.com

Skype:fcstsales91

Whatsapp:+8618720624696

Follow Us

Contact Us

Contact Us

  +86 21 3872 6791
 +86 21 3872 6792
  Rm402 block A Watts gallop tower No.2816 YiXian Rd, BaoShan District, Shanghai 200441.
Our Products

Our Products

Solution

Solution

Quick Links

Quick Links

©2021 Fiber Cable Solution Technology Co.,Ltd. All Rights Reserved.